I have really found it annoying the way the frames flop around until the second row of panels are stitched in place. I have tried using cans and boxes to hold them up with limited success.
On my latest build I had a bit of scrap 4x2 lumber hanging around. I cut off some short lengths about 5 or 6 inches long. I laid one on its side on the hull, butted up against each frame. Then I pushed a thumb tack through the frame into the end of the block of wood. Everything was held securely in place. Simple and easy.
Roger
On my latest build I had a bit of scrap 4x2 lumber hanging around. I cut off some short lengths about 5 or 6 inches long. I laid one on its side on the hull, butted up against each frame. Then I pushed a thumb tack through the frame into the end of the block of wood. Everything was held securely in place. Simple and easy.